XLB Engineering

Tuesday, August 18, 2009

Pipeline Repair


A view of some repair work of an 800mm diameter water pipeline. I was the on-site engineer.
Posted by Roan at 1:58 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2016 (2)
    • ►  May (2)
  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (2)
    • ►  September (1)
    • ►  June (1)
  • ►  2011 (1)
    • ►  May (1)
  • ►  2010 (1)
    • ►  September (1)
  • ▼  2009 (5)
    • ▼  August (5)
      • Mechanical Building Services
      • Pumpstation Upgrades and Maintenance
      • Pipeline Repair
      • Small Woodchip Hopper
      • Concrete Shutter System
  • ►  2008 (5)
    • ►  October (5)
  • ►  2007 (4)
    • ►  November (4)
  • ►  2006 (5)
    • ►  November (5)

Counter

Links

  • Google News
Awesome Inc. theme. Powered by Blogger.